✔ مكتمل

3.142MW BHOJABEDI PHASE 2(JAMJODHPUR) SOHAM ENTERPRICE

الرئيسية / المشاريع / 3.142MW BHOJABEDI PHASE 2(JAMJODHPUR) SOHAM ENTERPRICE

القدرة3.142MW
نوع المتتبّع1P HSAT Airavat(Block) (All DC)_45 Deg.
سنة التشغيلJan 2026
العميلSoham Enterprice
الموقعLalpur
3.142MW1P HSAT Airavat(Block) (All DC)_45 Deg.SUNCHASER X
نظرة عامة على المشروع

3.142MW Lalpur Solar Project Powered by 1P HSAT Airavat(Block) (All DC)_45 Deg.

The 3.142MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Lalpur, Gujarat. It was executed for Soham Enterprice. The plant was commissioned in Jan 2026.

The plant is built on the 1P HSAT Airavat(Block) (All DC)_45 Deg. system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

أين يقع

موقع المشروع — Lalpur

عرض على الخريطة ↗

هل أنت جاهز لبدء مشروعك؟

أخبرنا عن موقعك وسنصمّم حلّ متتبّع أو هيكل تركيب يناسب تضاريسك ومناخك وأهداف إنتاجك.

ابدأ مشروعاً →