3.8MW UDALPUR(PHASE-2) SUNDROP POWER
القدرة3.8MW
نوع المتتبّع1P TSAT
سنة التشغيلSep 2024
العميلSundrop Power
الموقعVisnagar
3.8MW1P TSATSUNCHASER X
نظرة عامة على المشروع
3.8MW Visnagar Solar Project Powered by 1P TSAT
The 3.8MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Visnagar, Gujarat. It was executed for Sundrop Power. The plant was commissioned in Sep 2024.
The plant is built on the 1P TSAT system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.
Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.
