✔ Abgeschlossen

3.8MW UDALPUR(PHASE-2) SUNDROP POWER

Start / Projekte / 3.8MW UDALPUR(PHASE-2) SUNDROP POWER

Leistung3.8MW
Tracker-Typ1P TSAT
InbetriebnahmeSep 2024
KundeSundrop Power
StandortVisnagar
3.8MW1P TSATSUNCHASER X
Projektübersicht

3.8MW Visnagar Solar Project Powered by 1P TSAT

The 3.8MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Visnagar, Gujarat. It was executed for Sundrop Power. The plant was commissioned in Sep 2024.

The plant is built on the 1P TSAT system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Standort

Projektstandort — Visnagar

Auf Karte ansehen ↗

Bereit, Ihr Projekt zu starten?

Erzählen Sie uns von Ihrem Standort und wir entwickeln eine Tracker- oder MMS-Lösung, die auf Gelände, Klima und Ertragsziele zugeschnitten ist.

Projekt starten →