5.004MW SAGABARA (GINNI FILAMENTS) KP GROUP
الرئيسية / المشاريع / 5.004MW SAGABARA (GINNI FILAMENTS) KP GROUP
القدرة5.004MW
نوع المتتبّع1P HSAT Airavat (All DC)
سنة التشغيلFeb 2026
العميلKp Group
الموقعTaloda
5.004MW1P HSAT Airavat (All DC)SUNCHASER X
نظرة عامة على المشروع
5.004MW Taloda Solar Project Powered by 1P HSAT Airavat (All DC)
The 5.004MW solar project adds to Sunchaser Structures' installed base of solar mounting and tracking systems at Taloda, Maharashtra. It was executed for Kp Group. The plant was commissioned in Feb 2026.
The 1P HSAT Airavat (All DC) platform underpins the installation, chosen for its structural stability, low maintenance demand and dependable day-to-day performance.
The project reflects Sunchaser's focus on precision engineering, durable structures and disciplined site execution for utility-scale solar.