5.004MW SAGABARA (GINNI FILAMENTS) KP GROUP

Home / Progetti / 5.004MW SAGABARA (GINNI FILAMENTS) KP GROUP

Potenza5.004MW
Tipo di inseguitore1P HSAT Airavat (All DC)
Messa in servizioFeb 2026
ClienteKp Group
LocalitàTaloda
5.004MW1P HSAT Airavat (All DC)SUNCHASER X
Panoramica del progetto

5.004MW Taloda Solar Project Powered by 1P HSAT Airavat (All DC)

The 5.004MW solar project adds to Sunchaser Structures' installed base of solar mounting and tracking systems at Taloda, Maharashtra. It was executed for Kp Group. The plant was commissioned in Feb 2026.

The 1P HSAT Airavat (All DC) platform underpins the installation, chosen for its structural stability, low maintenance demand and dependable day-to-day performance.

The project reflects Sunchaser's focus on precision engineering, durable structures and disciplined site execution for utility-scale solar.

Dove si trova

Posizione del sito — Taloda

Vedi sulla mappa ↗

Pronto ad avviare il tuo progetto?

Raccontaci del tuo sito e progetteremo una soluzione tracker o MMS su misura per terreno, clima e obiettivi di rendimento.

Avvia un progetto →