✔ Completato

5.164MW KUWANA KINTECH SYNERGY

Home / Progetti / 5.164MW KUWANA KINTECH SYNERGY

Potenza5.164MW
Tipo di inseguitore1P HSAT Airavat (All DC)
Messa in servizioMar 2026
ClienteKintech Synergy
LocalitàTharad
5.164MW1P HSAT Airavat (All DC)SUNCHASER X
Panoramica del progetto

5.164MW Tharad Solar Project Powered by 1P HSAT Airavat (All DC)

Sunchaser Structures supplied and commissioned the 5.164MW solar project at Tharad, Gujarat. It was executed for Kintech Synergy. The plant was commissioned in Mar 2026.

It uses the 1P HSAT Airavat (All DC) structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.

Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.

Dove si trova

Posizione del sito — Tharad

Vedi sulla mappa ↗

Pronto ad avviare il tuo progetto?

Raccontaci del tuo sito e progetteremo una soluzione tracker o MMS su misura per terreno, clima e obiettivi di rendimento.

Avvia un progetto →