✔ Terminé

5.164MW KUWANA KINTECH SYNERGY

Accueil / Projets / 5.164MW KUWANA KINTECH SYNERGY

Puissance5.164MW
Type de tracker1P HSAT Airavat (All DC)
Mise en serviceMar 2026
ClientKintech Synergy
LocalisationTharad
5.164MW1P HSAT Airavat (All DC)SUNCHASER X
Aperçu du projet

5.164MW Tharad Solar Project Powered by 1P HSAT Airavat (All DC)

Sunchaser Structures supplied and commissioned the 5.164MW solar project at Tharad, Gujarat. It was executed for Kintech Synergy. The plant was commissioned in Mar 2026.

It uses the 1P HSAT Airavat (All DC) structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.

Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.

Localisation

Emplacement du site — Tharad

Voir sur la carte ↗

Prêt à lancer votre projet ?

Parlez-nous de votre site et nous concevrons une solution tracker ou MMS adaptée à votre terrain, climat et objectifs de rendement.

Démarrer un projet →