✔ Completed

5.3MW CHITROD(KUTCH) GREEN GENESIS ENERGY PVT. LTD.

Home / Our Projects / 5.3MW CHITROD(KUTCH) GREEN GENESIS ENERGY PVT. LTD.

Capacity5.3MW
Structure type1P Seasonal Tilt(N)
CommissionedOct 2024
ClientGreen Genesis Energy Pvt. Ltd.
LocationRapar
5.3MW1P Seasonal Tilt(N)SUNCHASER X
Project overview

5.3MW Rapar Solar Project Powered by 1P Seasonal Tilt(N)

The 5.3MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Rapar, Gujarat. It was executed for Green Genesis Energy Pvt. Ltd.. The plant was commissioned in Oct 2024.

The plant is built on the 1P Seasonal Tilt(N) system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Where it is

Site location — Rapar

View on map ↗

Ready to start your project?

Partner with Sunchaser for precision-engineered solar trackers and mounting systems that enable faster installations, maximize energy generation, and deliver long-term reliability for utility-scale solar projects. Let's build your next solar project with confidence.

Start a Project →