✔ Abgeschlossen

5.3MW CHITROD(KUTCH) GREEN GENESIS ENERGY PVT. LTD.

Start / Projekte / 5.3MW CHITROD(KUTCH) GREEN GENESIS ENERGY PVT. LTD.

Leistung5.3MW
Tracker-Typ1P Seasonal Tilt(N)
InbetriebnahmeOct 2024
KundeGreen Genesis Energy Pvt. Ltd.
StandortRapar
5.3MW1P Seasonal Tilt(N)SUNCHASER X
Projektübersicht

5.3MW Rapar Solar Project Powered by 1P Seasonal Tilt(N)

The 5.3MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Rapar, Gujarat. It was executed for Green Genesis Energy Pvt. Ltd.. The plant was commissioned in Oct 2024.

The plant is built on the 1P Seasonal Tilt(N) system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Standort

Projektstandort — Rapar

Auf Karte ansehen ↗

Bereit, Ihr Projekt zu starten?

Erzählen Sie uns von Ihrem Standort und wir entwickeln eine Tracker- oder MMS-Lösung, die auf Gelände, Klima und Ertragsziele zugeschnitten ist.

Projekt starten →