✔ Completato

5.3MW CHITROD(KUTCH) GREEN GENESIS ENERGY PVT. LTD.

Home / Progetti / 5.3MW CHITROD(KUTCH) GREEN GENESIS ENERGY PVT. LTD.

Potenza5.3MW
Tipo di inseguitore1P Seasonal Tilt(N)
Messa in servizioOct 2024
ClienteGreen Genesis Energy Pvt. Ltd.
LocalitàRapar
5.3MW1P Seasonal Tilt(N)SUNCHASER X
Panoramica del progetto

5.3MW Rapar Solar Project Powered by 1P Seasonal Tilt(N)

The 5.3MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Rapar, Gujarat. It was executed for Green Genesis Energy Pvt. Ltd.. The plant was commissioned in Oct 2024.

The plant is built on the 1P Seasonal Tilt(N) system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

Dove si trova

Posizione del sito — Rapar

Vedi sulla mappa ↗

Pronto ad avviare il tuo progetto?

Raccontaci del tuo sito e progetteremo una soluzione tracker o MMS su misura per terreno, clima e obiettivi di rendimento.

Avvia un progetto →