✔ مكتمل

5.3MW CHITROD(KUTCH) GREEN GENESIS ENERGY PVT. LTD.

الرئيسية / المشاريع / 5.3MW CHITROD(KUTCH) GREEN GENESIS ENERGY PVT. LTD.

القدرة5.3MW
نوع المتتبّع1P SEASONAL TILT (N)
سنة التشغيلOct 2024
العميلGreen Genesis Energy Pvt. Ltd.
الموقعRapar
5.3MW1P SEASONAL TILT (N)SUNCHASER X
نظرة عامة على المشروع

5.3MW Rapar Solar Project Powered by 1P Seasonal Tilt(N)

The 5.3MW solar project is part of Sunchaser Structures' utility-scale solar portfolio at Rapar, Gujarat. It was executed for Green Genesis Energy Pvt. Ltd.. The plant was commissioned in Oct 2024.

The plant is built on the 1P Seasonal Tilt(N) system, engineered to hold module alignment accurately over the full project life and to keep generation consistent season after season.

Sunchaser's engineering, galvanised structural design and site execution keep the plant dependable through its operating life and reduce long-term maintenance effort.

أين يقع

موقع المشروع — Rapar

عرض على الخريطة ↗

هل أنت جاهز لبدء مشروعك؟

أخبرنا عن موقعك وسنصمّم حلّ متتبّع أو هيكل تركيب يناسب تضاريسك ومناخك وأهداف إنتاجك.

ابدأ مشروعاً →