9.522MW METHAN DEON ENERGY
Potenza9.522MW
Tipo di inseguitore1P HSAT
Messa in servizioFeb 2024
ClienteDeon Energy
LocalitàLakhtar
9.522MW1P HSATSUNCHASER X
Panoramica del progetto
9.522MW Lakhtar Solar Project Powered by 1P HSAT
Sunchaser Structures supplied and commissioned the 9.522MW solar project at Lakhtar, Gujarat. It was executed for Deon Energy. The plant was commissioned in Feb 2024.
It uses the 1P HSAT structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.
Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.