9.522MW METHAN DEON ENERGY
Puissance9.522MW
Type de tracker1P HSAT
Mise en serviceFeb 2024
ClientDeon Energy
LocalisationLakhtar
9.522MW1P HSATSUNCHASER X
Aperçu du projet
9.522MW Lakhtar Solar Project Powered by 1P HSAT
Sunchaser Structures supplied and commissioned the 9.522MW solar project at Lakhtar, Gujarat. It was executed for Deon Energy. The plant was commissioned in Feb 2024.
It uses the 1P HSAT structure, designed for precise module alignment, predictable long-term behaviour and straightforward installation on site.
Careful structural engineering and quality-controlled fabrication give the plant a long, low-maintenance service life while supporting steady energy delivery.
